Whoever reads the log later should find five answers on every line: where, when, with which instrument, what temperature and, if it was out of range, what was done. The example below shows two lines from a frozen store room with a target of -18 °C or colder.

TimePoint and instrumentReadingNoteDeviation and actionBy
07:30D1-S, rack above door, TK-03-19.5 °C--A.Y.
16:10D1-S, rack above door, TK-03-15.5 °CLoading, door open 12 minDoor closed, area cleared; 16:40 recheck: -18.4 °CA.Y.
  1. Take the point codes from the mapping study. Mapping a loaded room with many loggers shows the warmest and coldest spots; the permanent measuring points are those two plus one that represents the average.
  2. Put one reading in the busiest dispatch hour. A reading taken in the calm of the morning makes the log look good every day and never shows the problem.
  3. Write the defrost times at the top of the form. A high reading that falls in that window is explained in the Note column and is not confused with a real excursion.
  4. On a deviation, keep the reading, the action and the recheck on the same line. If the recheck has not returned to target, the product status and the person responsible are added too.
  5. At the weekly review the reviewer dates and signs; where a continuous logger runs, the name of its data file goes on the form.

The logger records the temperature; the person filling in the form records what happened: a door left open, pallets stacked in front of the evaporator. That is why the form hangs next to the measuring point, since a form kept in the office gets filled in without anyone walking to the point.