Product that has had a deviation, been returned or is awaiting a decision comes out of the picking flow. A block in the system is necessary, but while the product stays reachable on the shelf it can still be picked on a busy day, so the system block and a separate area on the floor work together.

The EU Good Distribution Practice guidelines (2013/C 343/01, section 3.2) ask for product awaiting a decision to be segregated physically or by a validated equivalent electronic system, and for falsified, expired, recalled and rejected product to be segregated physically at once in a dedicated area. The 2022 GDP inspection guideline of the Turkish Medicines Inspection Department looks for a quarantine and a rejected-goods section and asks whether these areas are locked with walls running up to the ceiling.

Feature of the areaReason
Marked and separateRemoves the risk of mixing
Restricted accessStops unauthorised movement
Matched to recordsProduct, batch, reason and date are known

Quarantine for a 2-8 °C product also takes place at 2-8 °C. The guidelines allow a returned cold-storage product back into saleable stock only if it is documented that it was kept in the authorised conditions throughout (section 6.3); a quarantine outside the cold room breaks that evidence. A marked, separated shelf inside the cold room solves it.

  • The decision arrives in writing.
  • The product is released or set aside for destruction.
  • The physical move and the system transaction happen at the same time.
  • The decision goes into the file.

Product that waits long takes space and gets forgotten; the decision time is set by product and quality system, and a reminder is generated when it passes.