During breakdown, waiting, unloading and reloading are separate intervals.
Plan transfer capacity. Define the area, handling equipment, container count and replacement vehicle layout.
Record breakdown, first unload and final reload times; avoid unnecessary lid openings.
Transfer record
- Product temperature and condition
- Container ID and location
- Replacement readiness
- Authorised decision
Assess product condition against its specification through authorised review; do not assume a fixed holding time.

