Track meltwater through the box to receiving.
Closed base
Retains it.
Review contact and unloading.
Drained base
Routes it out.
Check collection and cleaning.
Trial one load. Regulation 52(c): keep meltwater off fresh fish under ice.
Log water path. Verify the GEBHARDT model; quality staff decide disposition.

