Redundancy means more than a generator running. Verify in a scenario which loads remain powered, whether monitoring and alarms continue, and what staff must do during an outage.

Define the test scope. Include the generator, transfer equipment, critical cooling and monitoring equipment, alarms, and communication method.

Transfer and records

Authorized facilities staff should run a safe test under an approved procedure and record loss of mains, transfer to backup, and return to normal power. Monitor any change in product storage conditions.

A generator test should include the connected monitoring chain.

Representative load and limits

The test method must follow the facility design and generator manufacturer’s instructions.

Record how the load was represented and which circuits were included.

Check fuel, alarm notification, and staff contact methods in the scenario.

Include access or door systems if they also require backup power.

Actions during an outage. The responsible person follows site procedures for door use, manual records, and escalation.

If product must be moved, verify the receiving location and transport plan in advance; do not assume one universal outage duration.

Add event times, measurements, and decisions to the incident record.

Review after the test

Compare results with intended functions. Raise corrective actions for failed transfer, alarms, or records; retain evidence and closure decisions.

Keep the plan current. Reassess affected scenarios after changes to electrical panels, warehouse use, or equipment.