Vehicle arrival time alone does not determine loading priority.

Make the flow visible. Keep container ID, readiness, product-wait start and route departure on the board.

Separate closed waiting from active loading; log area and passage status by shift.

Stop record

  • Container state
  • Product-wait time
  • Planned departure
  • Dock order

Record order changes against approved product and operating conditions; for recurring congestion, compare appointment and preparation records.