Vehicle arrival time alone does not determine loading priority.
Make the flow visible. Keep container ID, readiness, product-wait start and route departure on the board.
Separate closed waiting from active loading; log area and passage status by shift.
Stop record
- Container state
- Product-wait time
- Planned departure
- Dock order
Record order changes against approved product and operating conditions; for recurring congestion, compare appointment and preparation records.

