Do not assume one carrier fits a battery module, e-drive component and assembly part alike. Selection starts with the component drawing and the plant's handling, cleanliness and shipping requirements.
Specify the part and support needs
Provide component dimensions, mass, centre of gravity and sensitive surfaces. During design review, agree where the carrier supports the part, how vibration or contact risks will be managed, and the orientation for loading.
Define the production-line interface
Describe forklift and manual handling needs, robot gripping and positioning areas if applicable, and clearances around line equipment. Obtain cleanliness requirements and inspection methods in writing from the buyer's quality team.
This line does not stand alone. Roll containers, warehouse equipment and pallet systems sit inside the GEBHARDT range as well.
Separate battery shipping status from the carrier
A battery's dangerous-goods classification and shipping conditions depend on the product and shipment status. Do not infer classification or ADR obligations from the carrier's features; confirm them with the shipping lead and dangerous-goods specialist.
Before series use, trial a sample on the production line and in the actual loading arrangement. Tie acceptance criteria for dimensions, damage, cleanliness and handling to the trial record.


