Orders alone do not show pool need.

Map the states

On a peak-day timeline, mark loaded, in transit, at branch, returning, washing and ready containers.

Find the highest simultaneous use from actual records.

Control card

  • Hourly dispatch
  • Return time
  • Wash capacity
  • Simultaneous need

Measure again

If the pool grows without more ready containers, review return and washing separately.