Trips that look acceptable individually can hide a directional process shift.
Locate the issue
Control limits are monitoring aids from a stable process, not product acceptance limits.
Build the comparison. Plot one defined measure from comparable routes and loads in time order; mark device and process changes.
Four control fields
- Measure and unit
- Reference period
- Signal review
- Process change
Let a signal trigger process review; product condition needs product measurement and authorised disposition.

