A washed mark alone does not explain the programme or inspection result.

Evidence file

  • Container ID
  • Prior load class
  • Wash programme
  • Check and release

Record the method

Use observations and process records under the site procedure; do not assume the same lab test for every unit.

Verification record. Enter rinse, drying, visual result and decision role. Do not mark a nonconforming unit ready; separate rewash from the first process.

A date and tick alone are insufficient for reviewing recurring issues.