Aris Makina & Otomotiv
← Blog

Supply relationships

Getting listed by a chain, audits, specifications, contracts, tenders. Knowing what the other side will ask for.

Signed on Friday, damage found on Monday: seven days, twenty-one days, in writing
23 August 2026
Signed on Friday, damage found on Monday: seven days, twenty-one days, in writing

A Friday delivery was signed off and the spoilage showed on Monday. For domestic carriage TTK Article 889, for international carriage CMR Article 30, allows seven days for concealed damage and twenty-one for delay; dispatching the letter in time is what holds the period.

Supply relationships
The sender did the loading: who carries the fault when the stack fails on the road
23 August 2026
The sender did the loading: who carries the fault when the stack fails on the road

If the central kitchen's own crew loads the vehicle, the burden of proof for a stack that shifts in transit falls back on the sender under Articles 863 and 878 of the Turkish Commercial Code; a written layout plan ties the argument to a document.

Regulations and standards
How long is a limited period, and who has to justify it?
23 August 2026
How long is a limited period, and who has to justify it?

The Food Hygiene Regulation lets food sit at ambient temperature for a limited period without naming a figure: the operator sets the limit and justifies it in the HACCP procedure.

Regulations and standards
Seventy-two hours at the transfer hub: outsourcing the handling does not outsource responsibility
23 August 2026
Seventy-two hours at the transfer hub: outsourcing the handling does not outsource responsibility

A pharmaceutical wholesaler's product may wait at a transfer hub for at most 72 hours; the Regulation ties that window to records and states that using the hub's services does not remove responsibility for quality.

Regulations and standards
You handed the trip to another carrier: who gets the bill if the load spoils
23 August 2026
You handed the trip to another carrier: who gets the bill if the load spoils

Hand a trip to an outside haulier and your liability to the customer stays: Articles 879, 888(3) and 877(1) of the Turkish Commercial Code say so.

Regulations and standards
How to document equipment choice, maintenance and use in a cold-transport claim
22 August 2026
How to document equipment choice, maintenance and use in a cold-transport claim

Evidence the load-equipment match, maintenance history and trip records separately.

Regulations and standards
8.33 SDR a kilo: what a spoiled pharma load really pays back
22 August 2026
8.33 SDR a kilo: what a spoiled pharma load really pays back

When a pharma load spoils, the carrier's payment is worked out from gross weight, not the invoice: 8.33 SDR per kilogram under CMR Article 23 for international road carriage and under Article 882 of the Turkish Commercial Code at home. Here is the arithmetic and the two ways past the ceiling.

Supply relationships
A frozen pallet refused at the ramp: protection, inspection and the burden of proof
22 August 2026
A frozen pallet refused at the ramp: protection, inspection and the burden of proof

For a frozen pallet refused at the ramp, protecting the goods and having their state properly established is the refusing buyer's job; without that, the burden of proof stays with the buyer. Communiqué 2015/34 describes how to measure.

Regulations and standards
When the transport invoice carries your name: four fixed costs of the TİO regime
22 August 2026
When the transport invoice carries your name: four fixed costs of the TİO regime

Even when someone else's truck drives, organising carriage in your own name and issuing the invoice requires a TİO authorisation; certificate fee, capital, insurance and ÜDY3 staff become fixed costs.

Cost and investment
Verify batch certification for series-produced containers under 2 m³
21 August 2026
Verify batch certification for series-produced containers under 2 m³

Article 16 of the Turkish regulation and ATP Annex 1 let one certificate cover a batch of small series containers by serial range; ask the offer for internal volume, the type report and the plate.

Regulations and standards
Is mince +3 or 2 °C? Two texts, two numbers, and which one binds
21 August 2026
Is mince +3 or 2 °C? Two texts, two numbers, and which one binds

The +3 °C for mince appears in the ATP roadside inspection guide table, while the text of the ATP agreement itself and the animal hygiene regulation both say 2 °C. Shipments work to 2 °C.

Regulations and standards
What conditions should a cold-chain promise cover?
19 August 2026
What conditions should a cold-chain promise cover?

Define a promise through product starting conditions, route duration and measurement records; avoid universal guarantees beyond the tested scope.

Supply relationships
Cold shipping for online fish sales
19 August 2026
Cold shipping for online fish sales

Plan fresh and frozen seafood separately; match product category, measurements and delivery records.

Food quality and shelf life
How do you prepare a route file for an Isotec TBX quote?
18 August 2026
How do you prepare a route file for an Isotec TBX quote?

Put route, load, vehicle and return-cycle details in one file and flag unknowns so suppliers quote the same scenario.

Supply relationships
How to compare included and excluded items in an Isotec TBX quote
18 August 2026
How to compare included and excluded items in an Isotec TBX quote

Match the model and requirements when comparing offers; mark each item as included, excluded or awaiting confirmation.

Supply relationships
Compare Isotec TBX quotes by currency and delivery scope
17 August 2026
Compare Isotec TBX quotes by currency and delivery scope

Show quote date, currency and delivery items separately; do not rank commercial totals before matching technical scope.

Supply relationships