A unit staged before vehicle arrival may wait at the dock; include that time in the shipment record.

View the route through activities

Record ready, dock-arrival and vehicle-loading times for each unit. State waiting location and condition.

Compare delay with the applicable product specification. Define recheck requirements in site procedure.

Route card

  • Ready time
  • Dock arrival
  • Vehicle loading
  • Waiting area

If units repeatedly queue, align preparation with vehicle appointments; authorized process decides product status.