A unit staged before vehicle arrival may wait at the dock; include that time in the shipment record.
View the route through activities
Record ready, dock-arrival and vehicle-loading times for each unit. State waiting location and condition.
Compare delay with the applicable product specification. Define recheck requirements in site procedure.
Route card
- Ready time
- Dock arrival
- Vehicle loading
- Waiting area
If units repeatedly queue, align preparation with vehicle appointments; authorized process decides product status.

