What we have written on the cold chain11 / 154
More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

Record each order change with old and new scope, technical impact and approval; match the current form to its drawing.
Read the article →
Track cycles by container identity; count only completed dispatch and return loops from actual records.
Read the article →
Assess peak dispatch volume alongside measured cycle time; count containers in transit and processing separately.
Read the article →
Do not treat successful deliveries as savings; establish comparable loss data for the same product and route.
Read the article →
Verify part origin, model compatibility and test result; link the donor and receiving container histories.
Read the article →
Measure freight, incremental kilometres, labour, storage and reconciliation time, then divide by units returned.
Read the article →
Record visible damage and seepage signs separately after a plate falls. Isolate a suspect plate and leave the use decision to an authorised review.
Read the article →
An absent record does not prove washing was skipped; compare run, shift and area traces, and document what remains uncertain.
Read the article →
Divide units returned within the window by units dispatched in the same cohort; track late returns and environmental data separately.
Read the article →
Divide relevant period costs by completed deliveries meeting the defined service criteria in that same period.
Read the article →
Do not equate a temperature record with a product quality decision; document batch, start, route and delivery observations together.
Read the article →
Plan branch-level emptying time and quantity alongside available return capacity and added distance.
Read the article →