The same daily dispatch may need more containers when cycle time lengthens.
Need card
- Peak daily dispatch
- Median cycle
- Peak-day cycle
- Ready-stock gap
Break down the cycle. Measure from loading until readiness for reuse; record transit, branch, washing and maintenance time separately.
If the bottleneck repeats
Compare the cost of improving the slow step with added-container cost over the same period.

