Linking open time to energy cost requires measurement.
Shift record
- Stop
- Opening duration
- Delay cause
Match conditions
Compare next-preparation inputs on the same route and load.
Cost boundary. Do not claim savings without measured energy input.

To estimate energy cost, compare opening duration and measured next-preparation inputs for the same route and shipment volume.
For the same route and load volume, record stop, opening duration, carton-search cause and next-preparation change. Match measured energy inputs before making an energy claim; do not convert waiting time alone into energy savings.
Linking open time to energy cost requires measurement.
Compare next-preparation inputs on the same route and load.
Cost boundary. Do not claim savings without measured energy input.
Sources and correction policy for this article