Start laboratory selection with the intended use of the result. Internal trend monitoring, a customer report and regulatory evidence may have different acceptance conditions; obtain the requester's written criterion.
If external work is needed, match the laboratory's accreditation scope to the required measurand, range and method first. Review the scope schedule or report example before work starts; accreditation alone is not enough.
After sensor calibration, validate site position, load, door openings and route conditions under a separate protocol. The sensor certificate belongs to the instrument; it does not alone document transport duration or product conformity.


