A small-looking impact may affect door alignment or an inner joint. Do not label it cosmetic and send it on route.

Follow the impact path. Record time, direction and load; inspect frame, floor, latch, door and wheel attachments.

Inspection record

  • Impact point
  • Door closure and alignment
  • Interior surface
  • Mobility hardware

Release decision

Complete the defined thermal acceptance test when required. Keep the container out of the ready pool until inspection is complete; address repeated impacts at the forklift route too.