A small-looking impact may affect door alignment or an inner joint. Do not label it cosmetic and send it on route.
Follow the impact path. Record time, direction and load; inspect frame, floor, latch, door and wheel attachments.
Inspection record
- Impact point
- Door closure and alignment
- Interior surface
- Mobility hardware
Release decision
Complete the defined thermal acceptance test when required. Keep the container out of the ready pool until inspection is complete; address repeated impacts at the forklift route too.

