Record base condition through observation, connection checks and a trial with the handling equipment used.

Define the task

Inspect entry direction, connections and welds, feet on the floor and projections.

Inspection record

  • Entry direction
  • Connection condition
  • Floor rocking
  • Empty trial

Next step

If an empty trial binds or visible damage appears, request maintenance review with a photo and record; do not assume load suitability.