Pre-cooling is not identical for every container or product flow. Review container and plate instructions separately from the product loading procedure.

If the procedure requires preconditioning, define the target state, measurement point and pre-load check. Do not confuse product temperature with container preparation.

For a comparison trial, record starting condition, loading time, lid openings and route data. The responsible person should assess the product result against approved acceptance criteria.