Freezing batches at different times may spread load. Match the plan to dispatch.
Measurement lines
- Plate return
- Readiness time
- Batch and load
- Meter consumption
Reduce load at the right point
Compare plate returns and readiness needs against hourly meter data. Trial off-peak timing for the same requirements.
Boundary shown by measurement
A schedule that misses readiness needs is unsuitable. Do not count a saving before measuring the difference.


