Freezing batches at different times may spread load. Match the plan to dispatch.

Measurement lines

  • Plate return
  • Readiness time
  • Batch and load
  • Meter consumption

Reduce load at the right point

Compare plate returns and readiness needs against hourly meter data. Trial off-peak timing for the same requirements.

Boundary shown by measurement

A schedule that misses readiness needs is unsuitable. Do not count a saving before measuring the difference.