A complaint total alone does not describe the pre-change state. Fix product volume, route and period definitions.

Four required fields

  • Period
  • Product and route
  • Event cause
  • Data quality

Make measurement repeatable

Extract dispatches, rejections, temperature events, delays, packaging loss and handling time under shared definitions.

Separate by product and route. Flag missing or low-quality rows; do not fill them with estimates.

Keep the baseline definition in later periods; changed denominators or periods cannot show comparable performance.