Monthly energy totals hide short demand peaks.
Shift measurement
- Equipment start
- Plate batch
- Metered kW peak
- Readiness result
Timeline
Match freezer starts, plate loading and other large loads to meter timestamps. Trial staggering only where records show overlap.
Verify service
Assess measured kW and duration alongside plate readiness for product requirements.


