Prepare the protocol before the quote and specification are closed.
The sequence to use in the field
Order checks for model, quantity, identity, equipment and loaded trial; attach evidence and a result to each step.
One-page field record
- Inspection step
- Evidence
- Result
- Open action
During Isotec supply in Türkiye, keep technical and commercial scope on separate lines.
The next step
Track each open action by unit ID and owner.

