A eutectic plate fits into a roof rail. An assessment should consider model, weight, rail height and daily repetition together.

Record the work sequence. Write down the plate and rail models, fitting method and operator reach.

Compare the lift and sliding steps with maker instructions.

Note any contact, jamming or loss of control during a trial.

Confirm the method against the local risk assessment and equipment instructions.

Finding of side reaching

If the operator reaches sideways, record the observation; do not assume one correct stance for everyone. Rail, container position or work layout may change following site assessment.

Gloves and grip

Moisture, plate surface and glove type can affect grip. Check the maker's recommended grip and observed slip findings; assess glove choice for the task.

Working height. Assess any shelf, stand or platform against the container and rail model instructions. Record visibility, balance and safe placement conditions too.

Fatigue and sequence

Compare observations at different points in the shift; record any skipped step or strain, along with the event and repetition count.

Repetition and reach findings should be reviewed together.

Transport arrangement

Assess carrying by hand or trolley against model instructions, route and load details. Add the trial result and chosen method to the shift record.

When rail height is fixed

Let the site's competent assessment decide whether task sharing or assistive equipment is needed. Record the owner, decision and review date.