Similar deviation curves can come from different events.
Avoid a quick conclusion. Check equipment, preparation, load, route, measurement and handling as separate branches.
Inspection sequence
Build the event timeline; match container ID, plate batch, loading and logger position with stop times.
Decision evidence
- Event time
- Branch tested
- Evidence
- Finding
Without proof, run a limited corrective trial and monitor it; do not record an assumption as the cause.


