Preparation starts with a packout validated for the product and route, not a generic coolant recipe.

Pre-dispatch check

Follow model instructions and the approved layout; check that product, container, coolant and route details match.

Closure record. Record container ID, product/run, layout check and closure time.

If there is a deviation