Follow product requirements and a validated packout; check the container, coolant, layout and run record together.
2 May 2026·Updated 24 September 2026
Short answer
Use the approved packout and model instructions for the shipment, then confirm that product and route conditions match them. Inspect the container, use only the specified coolant and layout, record product and run identity, and document closure. If an approval is missing or a deviation appears, pause loading and refer it to the authorized quality process.
Preparation starts with a packout validated for the product and route, not a generic coolant recipe.
Pre-dispatch check
Follow model instructions and the approved layout; check that product, container, coolant and route details match.
Closure record. Record container ID, product/run, layout check and closure time.