Adding plates will not automatically fix weak insulation or a leaking lid; it can also reduce usable load space.

Inspect lid, seals, body joints and voids. Use previous shipment records to locate when deviation began and check plate condition.

Run a one-variable trial on the same route and load: insulation repair or another approved plate layout. Compare product readings, load capacity and receipt findings, then record the result.