Morning preparation is about assigning ready containers to the right orders and dispatch sequence. Start with the day's route and load list.

Link each unit to its ID, cleanliness and damage status, plate set and assigned route. Move unready equipment to a separate area and record reason and owner.

Stage containers in loading order. At dispatch, confirm IDs with the driver and load owner; reconcile remaining or substituted equipment in the shift record.