A fixed blast room and a plug-in freezer cabinet represent different investments and operating arrangements as a plate fleet grows.
Add building work, equipment, electrical connection, maintenance and installation time to the comparison.
A room may require construction and services; check available space and supply conditions before requesting a cabinet quote.
If portability matters, obtain the cabinet's moving and recommissioning conditions from the supplier in writing.
Price a room expansion project and an additional cabinet as separate responses to higher capacity needs.
In a rented facility, clarify fixed-asset status at lease end and required permissions with the owner.
For steady, high demand assess a room; for variable demand, assess the flexibility of adding a cabinet.
The former eTBX page listed 230 V and capacity up to 56 plates; request separate terms for current cabinets.
For energy comparison, use meter data for the same plate count, starting condition and completed cycle.
Choose a common period, such as five years, and show investment, energy, maintenance and space costs in one table.


