Aris Makina & Otomotiv
← Blog

Cost and investment27 / 27

Time-temperature indicators: the history carried on the pack
23 October 2021
Time-temperature indicators: the history carried on the pack

A TTI label adds up the temperature a pack has seen and the time spent there in one irreversible colour change. The main types, the VVM classes used on vaccines, and why a TTI does not replace a logger.

Measurement and traceability
How to allocate a cold-chain investment budget by bottleneck
10 October 2021
How to allocate a cold-chain investment budget by bottleneck

Measure the bottleneck and full operating cost before choosing a vehicle or room.

Cost and investment
How to measure stretch film per pallet
8 October 2021
How to measure stretch film per pallet

Measure film use by roll weight and pallets wrapped; track load security alongside damage and shifting records.

Single-use packaging
Two kinds of date: best before, use by, and when to mark down
6 October 2021
Two kinds of date: best before, use by, and when to mark down

Use by is a safety limit and selling past it is prohibited; best before is a quality date. The markdown decision comes from the gap between stock on hand and what can sell in the days left.

Retail operations
How to measure the cost of a container wash line
2 October 2021
How to measure the cost of a container wash line

The water bill is not the full cost. Track energy, labour, chemicals, drying, space and downtime per clean, ready-to-use container.

Managing reusable containers
When the price of cardboard jumps, who does what
27 September 2021
When the price of cardboard jumps, who does what

SCA has announced a €100 per tonne increase on kraftliner in Europe from 1 September 2026. This piece shows how it reaches the carton price, how quotes are levelled and how cost per shipment is worked out, with an example.

Cost and investment
Calculate Isotec total cost per delivery
16 September 2021
Calculate Isotec total cost per delivery

Do not compare purchase price alone. Total costs for the same period, route and acceptance criteria, then divide by accepted deliveries.

Cost and investment
Six useful KPIs for an Isotec fleet
14 September 2021
Six useful KPIs for an Isotec fleet

Container count alone is not capacity. Track use, return, excursions, loss, washing and maintenance with explicit numerators and denominators.

Managing reusable containers
Rent or buy ISOTEC? Compare cost per trip
8 September 2021
Rent or buy ISOTEC? Compare cost per trip

Use your own route, maintenance and idle-time records instead of guessed utilisation. A mixed model can also cover seasonal peaks.

Cost and investment
What determines the ISOTEC price? Nine inputs before a quote
7 September 2021
What determines the ISOTEC price? Nine inputs before a quote

A model name alone does not produce a useful price. Put nine inputs on one form and competing quotes become genuinely comparable.

Cost and investment