Aris Makina & Otomotiv
← Blog

Measurement and traceability3 / 39

How to inspect a TBX pallet base in the field
14 August 2026
How to inspect a TBX pallet base in the field

Record fork entry, base connections and floor contact; use an actual handling trial to decide whether maintenance review is needed.

Containers and equipment
Include sun exposure in route records
14 August 2026
Include sun exposure in route records

Record ramp and storefront waits separately; track duration, exposure and lid use against route validation.

Containers and equipment
How should you track an impact mark on Isotec TBX?
14 August 2026
How should you track an impact mark on Isotec TBX?

Record a new mark by location, date and photo. If contact recurs, inspect the same area in warehouse and vehicle flow.

Containers and equipment
Check insulated-container dock fit in the real workflow
14 August 2026
Check insulated-container dock fit in the real workflow

Along with door and dock dimensions, trial loaded travel direction, floor joints and opposing traffic, then record the cycle time.

Containers and equipment
Prepare a pre-dispatch risk file for dry ice in Isotec TBX
14 August 2026
Prepare a pre-dispatch risk file for dry ice in Isotec TBX

Review product compatibility, responsible role, safety documents, ventilation and emergency steps together in the pre-dispatch procedure.

Containers and equipment
Can an insulated container manoeuvre in the warehouse aisle?
13 August 2026
Can an insulated container manoeuvre in the warehouse aisle?

Do not measure aisle width alone; trial turns, operator space and backing out with loaded and empty containers.

Containers and equipment
How to define an eutectic plate layout with photos
13 August 2026
How to define an eutectic plate layout with photos

Show plate identity, direction, product boundary and version in layout photos; compare the field arrangement with the approved image.

Containers and equipment
In what condition should an ice pack enter the box?
13 August 2026
In what condition should an ice pack enter the box?

A hard-looking surface does not show that the whole filling is ready. A plate goes into the box after it has been frozen through at least 5 °C below its melting point.

Containers and equipment
How should plates be sorted after an Isotec TBX trip?
13 August 2026
How should plates be sorted after an Isotec TBX trip?

Sort returned plates by identity, cleanliness and condition before preparation; review uncertain items before mixing them into freezer stock.

Containers and equipment
How do you separate two containers with the same ID?
12 August 2026
How do you separate two containers with the same ID?

Verify the duplicate on both containers, preserve records and follow an authorized correction; a collision alone is not a temperature deviation.

Containers and equipment
Minimize data in driver-level deviation analysis
12 August 2026
Minimize data in driver-level deviation analysis

Start with vehicle and route analysis; send any person-linked table for privacy review.

Regulations and standards
What happens when an ice pack is not fully frozen?
12 August 2026
What happens when an ice pack is not fully frozen?

A partly frozen plate still gives cold at its melting point but only for as long as the cold it stored. The problem often starts on the freezing rack, not on the road.

Containers and equipment
How to use eutectic plate colour codes in the field
12 August 2026
How to use eutectic plate colour codes in the field

Verify colour against the type label and stock code; do not select a plate by colour alone.

Containers and equipment
What fails when an ice pack moves inside the box?
12 August 2026
What fails when an ice pack moves inside the box?

A loose ice pack strikes the goods and breaks the coolant layout set in the trial. Use the EU load-securing accelerations to work out the braking force on a plate and choose the holder to match.

Containers and equipment
How should loading on a eutectic plate rack be tracked?
12 August 2026
How should loading on a eutectic plate rack be tracked?

Count more than units: track rack zone, plate type, entry sequence and exit check in one record.

Containers and equipment
How should ice build-up on an ice pack be managed?
11 August 2026
How should ice build-up on an ice pack be managed?

Loose ice on a plate turns into water and a slippery floor in the preparation area, and hides the label and cracks. Removing it is not enough; the source of the moisture has to be found.

Containers and equipment