GEBHARDT requires the filling of a eutectic plate to be fully frozen and solid before use. The plate is frozen at least 5 °C below its melting point; the recommended time is 24 hours, and depending on the cooling technology it can run anywhere from 8 to 24 hours.

Melting pointFreezing temperature
-3 °C-8 °C
-14 °C-19 °C
-18 °C-23 °C
-21 °C-26 °C

While freezing, the plates must not touch each other; a gap has to remain so cold air can circulate between them, and GEBHARDT recommends its freezing rack for this.

At take-out, tilt the plate. If liquid slides inside, the filling has not solidified and the plate stays out of dispatch. If nothing moves the filling is solid, but a shake does not show that the temperature reached 5 °C below the melting point; the measured cabinet temperature and the plate's in and out times prove that.