What we have written on the cold chain26 / 154
More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

Plan for observed terminal queues and exposure, not timetable alone; define transfer and alternate-route decisions.
Read the article →
Alarm delay is not one interval: separate sampling, transmission, notification and response, then add their worst cases.
Read the article →
Assess product specification, packaging and route measurements together; avoid assuming colder is always better.
Read the article →
If a lid will not close fully, the hinge is the third place to look after the seal and the latch. Measuring the play at both corners, at the same point, against a first reference value shows how fast it wears.
Read the article →
Assess glove protection and grip alongside the task; record any mismatch and the chosen response.
Read the article →
If midday run extremes stand apart, check time basis and missing records, then compare runs in like-for-like bands.
Read the article →
If odour stays after washing, the first step is to separate the source, not to use a stronger chemical: residue, rinsing, drying or surface.
Read the article →
When traffic closes a road, the shortest navigation alternative may not be the lowest cold-chain risk.
Read the article →
Preserve raw data, build a shared timeline and test each possible cause against supporting or contradicting evidence.
Read the article →
Assess each component in one order by its own product requirements, secondary packaging and delivery decision.
Read the article →
Compare ambient, loading area, door openings, load and plate readiness with the validated route conditions.
Read the article →
When one shift starts preparation and another completes dispatch, container state can be left to verbal memory. Plate freezing time, pre-cooling and logger state belong in the handover record.
Read the article →