What we have written on the cold chain41 / 154
More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

Two short events and one long event can produce the same total duration.
Read the article →
Separate delivery inspection from performance acceptance. Define the load, route and measurement points first, then compare results with the agreed record.
Read the article →
A useful form is defined by whether a record can be matched to a container and shift. Start with five fields and check completion.
Read the article →
Match planned runs to downloaded files by ID; investigate unmatched runs without assuming the recorder was never started.
Read the article →
At one cut-off time, match identity, status and location, then classify each difference by container.
Read the article →
Before washing, record container ID, arrival time, previous load and initial condition observations.
Read the article →
A fixed limit sounds only after it is crossed. The hard part of a rate alarm is telling a door opening from a real failure; here is how to set the hold time, the sensor position and the WHO requirements.
Read the article →
Use pre-defined operating steps offline and keep product disposition separate.
Read the article →
Explain the assessed total and missing records before interpreting a trip deviation rate.
Read the article →
Record unit identity, cleaning state and requested work at maintenance handover; do not treat repair completion alone as release for reuse.
Read the article →
Apply actual kWh, fuel, and invoice prices to scenarios; keep tariff and consumption assumptions separate.
Read the article →
Tie the wash record to one clear check: the container, points inspected and the second checker should appear in the same record.
Read the article →