Aris Makina & Otomotiv
← Blog

BlogPage 76 / 155

What to do with cold freight if an Eastern Anatolia route closes
31 March 2025
What to do with cold freight if an Eastern Anatolia route closes

Confirm closures with an official source; let the route owner manage rerouting and load decisions.

Risk and emergencies
Monitor equipment in humid, salty conditions with records
30 March 2025
Monitor equipment in humid, salty conditions with records

Measure actual coastal humidity and salt exposure. Set washing, drying and metal-part checks from model instructions.

Containers and equipment
Treat 45°C as a measured route scenario
29 March 2025
Treat 45°C as a measured route scenario

The 45°C headline is not observed weather data. Verify the dispatch-day forecast and route readings; plan for the load and delivery conditions.

Transport and routing
Plan overnight motorway stops for chilled loads
28 March 2025
Plan overnight motorway stops for chilled loads

During a planned stop, record parking conditions, openings and product readings. One morning reading cannot approve the remaining route.

Transport and routing
Measuring cold-chain deliveries between Istanbul's two sides
27 March 2025
Measuring cold-chain deliveries between Istanbul's two sides

Do not choose a bridge or ferry crossing by assumption; compare actual trip, wait and product records across options.

Transport and routing
Planning a winter shipment over the Bolu route
26 March 2025
Planning a winter shipment over the Bolu route

Verify current road information before departure; link waiting, alternate routing and product monitoring in one shipment plan.

Transport and routing
The evidence file an auditor will ask for
25 March 2025
The evidence file an auditor will ask for

An audit looks less at whether the work was done right than at whether that can be shown with records. Each group of documents rests on a GDP chapter, and most records must be kept for at least five years.

Regulations and standards
How to build a container measurement map
24 March 2025
How to build a container measurement map

Do not choose sensor positions by fixed-point assumptions. Define load, plate and shelf layout, then assess suitable points in a documented trial.

Measurement and traceability
What should a driver record during a trip?
23 March 2025
What should a driver record during a trip?

Record route, container ID, handover time, lid status and deviations in one workflow. Adapt the short check card to product procedures.

Transport and routing
Manage the warehouse plate cycle with records
22 March 2025
Manage the warehouse plate cycle with records

Record issue, return, damage and freezing status against plate IDs. Shift owners can resolve gaps and prepare the next trip from actual stock.

Warehouse and dispatch
An Isotec checklist for quality owners
20 March 2025
An Isotec checklist for quality owners

Build the checklist around product requirements and site procedures; assign an owner and evidence for each item.

Regulations and standards
Manage odour and residue in containers
19 March 2025
Manage odour and residue in containers

Do not assume the source of odour; inspect removable parts, cleaning steps and verification records.

Containers and equipment
Make post-wash drying a verifiable step
18 March 2025
Make post-wash drying a verifiable step

Add drying area, container ID and inspection to the wash record. Keep wet containers separate from clean, dispatch-ready stock.

Containers and equipment
Select container disinfectant by label and material compatibility
17 March 2025
Select container disinfectant by label and material compatibility

Check labeled use, application instructions and rinsing conditions. Verify compatibility with the body, seal and contact surfaces.

Containers and equipment
Gasket care and replacement intervals
16 March 2025
Gasket care and replacement intervals

Cold leaking past a gasket never shows on an invoice but sits in the temperature curve. The replacement interval comes from a check record tied to the container ID, not from a calendar.

Containers and equipment
How to inspect corrosion on aluminium profiles
15 March 2025
How to inspect corrosion on aluminium profiles

A stain alone is not a corrosion diagnosis. Record location, finish, contacting metal and manufacturer care instructions.

Containers and equipment