Aris Makina & Otomotiv
← Cold chain guide hub

What we have written on the cold chain33 / 154

More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

How should plate stock be protected during a power outage?
9 July 2026
How should plate stock be protected during a power outage?

Repeated freezer checks during an outage can consume its cold reserve; track the event with records.

Read the article →
Cold-chain SLA terms
9 July 2026
Cold-chain SLA terms

Delivery-time or temperature targets cannot be measured consistently without event boundaries and evidence sources.

Read the article →
Hysteresis: why an alarm chatters
8 July 2026
Hysteresis: why an alarm chatters

The alarm sounds for a minute, stops, then sounds again. The cause is usually that the switch-on and switch-off points sit at the same value, and it can be fixed without widening the product limit.

Read the article →
How to review a delivery error with the team
8 July 2026
How to review a delivery error with the team

Use the authorised route for product decisions, then record the event sequence, missing information and process change.

Read the article →
Assess chilled and frozen records separately
8 July 2026
Assess chilled and frozen records separately

Combining different products and run conditions in one average can hide outliers; first match regime and run type.

Read the article →
How should plates queue in front of a freezer?
8 July 2026
How should plates queue in front of a freezer?

Separating incoming and outgoing plates helps prevent batch mix-ups and blocked freezer flow.

Read the article →
Sawtooth temperature graph
8 July 2026
Sawtooth temperature graph

A record that repeatedly rises and falls is not random noise: if its spacing matches a field event the graph shows the operation, and if not it points at the measurement setup.

Read the article →
How to manage container flow during a wash-water outage
8 July 2026
How to manage container flow during a wash-water outage

Separate dirty returns from ready stock; track outage, queue and clean stock to plan restart order.

Read the article →
Who can access carrier temperature data and how?
8 July 2026
Who can access carrier temperature data and how?

Agree raw files, viewing roles, export format and incident-sharing route before dispatch.

Read the article →
Manage the thermal-container wash queue by status
8 July 2026
Manage the thermal-container wash queue by status

Link intake inspection to container ID, previous load and arrival time; keep units needing special handling out of the standard queue.

Read the article →
Temperature peak height and duration
8 July 2026
Temperature peak height and duration

Two events with the same maximum can deliver different amounts of heat to a product. Here is how degree-hours above a limit and mean kinetic temperature separate them in a 24-hour record, and how the recording interval can hide a peak.

Read the article →
Which records to check during a logger-platform outage
8 July 2026
Which records to check during a logger-platform outage

Verify platform access separately from device logging; plan local-data checks, manual event records and reconciliation after service returns.

Read the article →