What we have written on the cold chain62 / 154
More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

Do not assume a fixed gap; use product instructions, container model, packaging and measured load trials.
Read the article →
A lidded thermobox can be stacked; the load the bottom box carries sets the number of layers, and in a vehicle the column must resist 0.5 g sideways.
Read the article →
Assess slope, load and brake equipment on site; follow manufacturer instructions and the risk plan.
Read the article →
Beyond plates and dry ice there is a third route: turning liquid carbon dioxide into snow inside the box. The sublimation temperature, the cooling per kilogram and the CO2 limit in a closed cab set the terms.
Read the article →
The cause is often load height, trapped packaging or a dirty seating face rather than the lid itself. Pressing down only hides it.
Read the article →
Dry ice can release CO₂ gas. Do not open in an enclosed, poorly ventilated area; follow the SDS and site risk plan.
Read the article →
The same EPP box can run hot and cold loads on one day. The second run starts only after the box is washed, dried and back at a cold starting condition, and the worked example shows what that window does to the box count.
Read the article →
First protect people from slips and contact. Isolate the plate and affected load for product-specific assessment.
Read the article →
The liner, outer face and joints can hold different soils. Set and record cleaning and drying steps from the model instructions and site procedure.
Read the article →
The ATP certification plate is fixed permanently in a clearly visible place and carries the approval number, the class code and the month the approval expires.
Read the article →
A thermobox needs no power and makes no cold. Freezing the plate, the loading temperature and a lid that closes without force are all settled before the run starts.
Read the article →
The weld is the least inspected and most heavily loaded spot on a container. ISO 3834 shows how welding is controlled; GEBHARDT's welding certificate covers welded steel constructions, special load carriers and containers.
Read the article →