Aris Makina & Otomotiv
← Cold chain guide hub

What we have written on the cold chain75 / 154

More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

A shared logistics plan for a producers' group
11 October 2025
A shared logistics plan for a producers' group

Pilot load consolidation on a small scale with route, cost allocation, product separation and responsibility records.

Read the article →
Plan a rural collection point from field data
10 October 2025
Plan a rural collection point from field data

Test the site against actual route and handoff records, with named owners and a backup receiver.

Read the article →
A failure contingency plan for a sea container
8 October 2025
A failure contingency plan for a sea container

Agree contacts, power options, records and cargo decisions with named owners before sailing.

Read the article →
Temperature during a wait at the port
7 October 2025
Temperature during a wait at the port

What decides chilled cargo at a port is less how long it waits than whether the container is on power while it waits. Power confirmation and event times go on record.

Read the article →
How to run traceable food distribution after an earthquake
6 October 2025
How to run traceable food distribution after an earthquake

Manage changing routes by matching safe access points, product history and handoff times.

Read the article →
How to manage loads and equipment after flooding
5 October 2025
How to manage loads and equipment after flooding

Secure the area, identify products separately from equipment, and record evidence for each decision.

Read the article →
How to reduce moisture risk when loading in rain
4 October 2025
How to reduce moisture risk when loading in rain

Check lid, packaging and floor before loading; document wet or damaged items.

Read the article →
How many containers? The answer is in the shift plan
25 September 2025
How many containers? The answer is in the shift plan

The container count follows from the time a container needs from leaving to being ready again, divided by the gap between shift departures. The formula, a worked example and the legal limit on a washing night shift.

Read the article →
The temperature clause in a transport contract
24 September 2025
The temperature clause in a transport contract

Writing a range is not enough. Without the measuring point, the tolerance and who holds the record, the clause cannot be applied.

Read the article →
Turn an equipment manual into a useful field card
22 September 2025
Turn an equipment manual into a useful field card

Put the current revision, check steps, stop signs and escalation contact on the card.

Read the article →
Assigning containers and recording them as assets
21 September 2025
Assigning containers and recording them as assets

Equipment everyone is responsible for is equipment nobody is responsible for. An assignment record ties a container to a person or unit; the asset register covers only items above 12,000 TL.

Read the article →
Clarify container ownership and use records in the contract
20 September 2025
Clarify container ownership and use records in the contract

Define owner, user, return, damage and record owner separately in the contract. Link issue movements to the arrangement by container ID.

Read the article →