Aris Makina & Otomotiv
← Cold chain guide hub

What we have written on the cold chain87 / 154

More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

Plan fresh herb shipments by species and lot
24 April 2025
Plan fresh herb shipments by species and lot

Check herb species, wash status and buyer specification. Compare wilting, crushing and temperature findings at handoff points.

Read the article →
Ripeness and cold at the kiwi harvest
23 April 2025
Ripeness and cold at the kiwi harvest

Kiwifruit is picked firm and kept for months. What makes that possible is measured harvest maturity and cooling working together.

Read the article →
Set dispatch conditions for each Alanya avocado lot
22 April 2025
Set dispatch conditions for each Alanya avocado lot

Match cultivar, maturity and destination specification. Keep pre-loading product readings, route records and delivery quality findings with the same lot.

Read the article →
Post-harvest cooling for fresh figs
21 April 2025
Post-harvest cooling for fresh figs

Fresh figs are held at -1 to 0 °C and 90-95% humidity, forced-air cooled to 0 °C promptly after harvest and carried in a single layer. Temperature, humidity and tray layout in one table.

Read the article →
The first hours of the apricot and peach harvest
20 April 2025
The first hours of the apricot and peach harvest

Stone fruit keeps ripening after picking. The harvest-day clock and the first cooling decide where, and how fast, that ripening happens.

Read the article →
Track both bunch stems and berries in table grapes
19 April 2025
Track both bunch stems and berries in table grapes

At lot receipt, inspect berries, stems, packaging and airflow; match buyer specifications with route measurements.

Read the article →
Record the interval from citrus harvest to packing
18 April 2025
Record the interval from citrus harvest to packing

Link field shade, harvest time and packhouse receipt to the lot; take cooling targets from variety-specific instructions.

Read the article →
Lamb carcasses: on the rail or in a container
17 April 2025
Lamb carcasses: on the rail or in a container

Whole carcasses travel on rails and cut meat in containers; the customer's product form decides. On either route the meat must be at 7 °C before transport and stay there for the whole journey.

Read the article →
How to plan offal transport and records
15 April 2025
How to plan offal transport and records

Include leak control, product separation and cleanability in the transport plan for offal and by-products.

Read the article →
Which handoffs and waits should be confirmed for unaccompanied Ro-Ro freight?
8 April 2025
Which handoffs and waits should be confirmed for unaccompanied Ro-Ro freight?

Verify drop-off, sailing, destination handover, power, and supervision with the route operator.

Read the article →
How to learn a factory's receiving process before delivery
7 April 2025
How to learn a factory's receiving process before delivery

Confirm security, internal route, appointment, parking, and receiving steps with the site contact in advance.

Read the article →
What should be confirmed in writing for chilled groupage freight?
6 April 2025
What should be confirmed in writing for chilled groupage freight?

Confirm in writing that the carrier accepts the product, packaging, transshipment, and record conditions for the route.

Read the article →