Aris Makina & Otomotiv
← Cold chain guide hub

What we have written on the cold chain90 / 154

More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

Segregate and assess goods and equipment after a fire
7 March 2025
Segregate and assess goods and equipment after a fire

Segregate lots exposed to smoke or heat. Decide on product acceptance and equipment reuse under authorised procedures.

Read the article →
Compare route changes using measurement records
6 March 2025
Compare route changes using measurement records

Record a baseline with the same load and delivery conditions; change one factor and measure again.

Read the article →
Measuring container utilisation
5 March 2025
Measuring container utilisation

The question to ask before buying more containers: how much of the day do the current ones work. The ratio is container-hours dispatched divided by container-hours available.

Read the article →
Export recorder archives and test restoration
4 March 2025
Export recorder archives and test restoration

Name trip files with identifiers, keep an independent backup and verify that a sample file can be restored.

Read the article →
Prepare a traceable per-trip temperature summary
3 March 2025
Prepare a traceable per-trip temperature summary

Match trip ID, measurement point, device and timestamps. Route deviations and data gaps to the authorised owner under product instructions.

Read the article →
Read lid events alongside temperature measurements
2 March 2025
Read lid events alongside temperature measurements

A lid sensor may show event timing; it cannot alone prove product temperature or the cause of a deviation. Match it with other records.

Read the article →
Reconcile container IDs with warehouse records
1 March 2025
Reconcile container IDs with warehouse records

Assign each returnable container one ID; reconcile its location against shipment and movement records, then resolve mismatches by count.

Read the article →
Define scope and data when sharing temperature records
28 February 2025
Define scope and data when sharing temperature records

Agree shipment and device IDs, measurement point, period and file format in advance. Limit raw-data access to customer scope and permissions.

Read the article →
Quarantine and retire a container taken out of service
27 February 2025
Quarantine and retire a container taken out of service

Segregate an out-of-service container and record the reason and repair assessment. Verify reuse, sale or disposal route under authorized procedures.

Read the article →
What to track during the first 30 days after commissioning
25 February 2025
What to track during the first 30 days after commissioning

Link acceptance, route use, measurements, cleaning and fault records to the equipment ID from day one.

Read the article →
Assessing warranty scope with use records
24 February 2025
Assessing warranty scope with use records

Check coverage in the warranty and sales contract; link installation, maintenance and fault evidence to the serial number.

Read the article →
Staging an equipment purchase around a pilot and measurements
23 February 2025
Staging an equipment purchase around a pilot and measurements

Trial the first batch on a representative route; base expansion on measured acceptance criteria and comparable quotes.

Read the article →