Aris Makina & Otomotiv
← Cold chain guide hub

What we have written on the cold chain89 / 154

More articles from the Isotec guide hub: choosing containers, eutectic plates, measurement, regulation and notes from the field.

An Isotec checklist for quality owners
20 March 2025
An Isotec checklist for quality owners

Build the checklist around product requirements and site procedures; assign an owner and evidence for each item.

Read the article →
Manage odour and residue in containers
19 March 2025
Manage odour and residue in containers

Do not assume the source of odour; inspect removable parts, cleaning steps and verification records.

Read the article →
Make post-wash drying a verifiable step
18 March 2025
Make post-wash drying a verifiable step

Add drying area, container ID and inspection to the wash record. Keep wet containers separate from clean, dispatch-ready stock.

Read the article →
Select container disinfectant by label and material compatibility
17 March 2025
Select container disinfectant by label and material compatibility

Check labeled use, application instructions and rinsing conditions. Verify compatibility with the body, seal and contact surfaces.

Read the article →
Gasket care and replacement intervals
16 March 2025
Gasket care and replacement intervals

Cold leaking past a gasket never shows on an invoice but sits in the temperature curve. The replacement interval comes from a check record tied to the container ID, not from a calendar.

Read the article →
How to verify hygiene on an insulated container surface
14 March 2025
How to verify hygiene on an insulated container surface

Appearance alone does not prove hygiene. Record material compatibility, damage points and cleaning verification.

Read the article →
How to manage plate preparation during a power outage
13 March 2025
How to manage plate preparation during a power outage

Record interrupted cycles and affected lots; verify manufacturer and quality acceptance before reusing plates.

Read the article →
What contingency to build for a single-source supply chain
12 March 2025
What contingency to build for a single-source supply chain

Use stock, lead-time and usage records to identify stoppage-critical parts and validate a suitable backup.

Read the article →
A temporary fix in the field after container damage
11 March 2025
A temporary fix in the field after container damage

Damage on the road forces two decisions: does the trip continue and can the goods be protected. A temporary fix never replaces a proper repair.

Read the article →
Saving a trip when the plate set goes missing
10 March 2025
Saving a trip when the plate set goes missing

Look first for a spare set with the same melting point; if there is none, three routes remain: delay the trip, split the order or go out with dry ice.

Read the article →
Segregate soiled carriers and wait for approved washing
9 March 2025
Segregate soiled carriers and wait for approved washing

Do not skip cleaning when water is unavailable. Segregate soiled carriers, verify an approved alternative and resume with records.

Read the article →
Manual records and controlled continuity during a WMS outage
8 March 2025
Manual records and controlled continuity during a WMS outage

Maintain batch and movement traceability manually during an outage. Decide to continue or stop based on record capability and authorised procedure.

Read the article →