Aris Makina & Otomotiv
← Blog

Supply relationships5 / 24

How many sensors for thermal mapping
22 July 2026
How many sensors for thermal mapping

The WHO guide starts from 12 fixed sensors; a medium-sized cold unit typically gets about 20 sensors plus one for ambient.

Measurement and traceability
What belongs in a temperature logger calibration record?
21 July 2026
What belongs in a temperature logger calibration record?

Match device identity to reference, date, result and use decision; link certificate information to the relevant trip record.

Measurement and traceability
Build a sensor map from pilot findings
21 July 2026
Build a sensor map from pilot findings

Select sensor points from pilot load geometry and observed hot or cold spots; record location evidence rather than a fixed device count.

Measurement and traceability
File temperature data with logger and trip identity
19 July 2026
File temperature data with logger and trip identity

Match the raw file to logger identity, trip time and time zone; retain checksum, version and data gaps in the decision file.

Measurement and traceability
How to check logger battery and recording before a trip
19 July 2026
How to check logger battery and recording before a trip

Do not rely on battery indication alone; test before dispatch for the device, interval and conditions, then verify the file on return.

Measurement and traceability
Record the receiver, acknowledgment and escalation for temperature alarms
18 July 2026
Record the receiver, acknowledgment and escalation for temperature alarms

Name the first receiver, response record, backup escalation and authorized product-decision role for each alarm.

Measurement and traceability
How to assess a temperature alarm delay
18 July 2026
How to assess a temperature alarm delay

Alarm delay is not one interval: separate sampling, transmission, notification and response, then add their worst cases.

Measurement and traceability
How do you separate evidence from hypotheses in a temperature deviation?
17 July 2026
How do you separate evidence from hypotheses in a temperature deviation?

Preserve raw data, build a shared timeline and test each possible cause against supporting or contradicting evidence.

Measurement and traceability
How to make cold-chain CAPA traceable
17 July 2026
How to make cold-chain CAPA traceable

Link event evidence to a verified root cause, action owner and date, then to an effectiveness check.

Measurement and traceability
How should a thermal-packaging change be approved?
16 July 2026
How should a thermal-packaging change be approved?

When SKU, material, plates or layout change, document whether the prior qualification still applies.

Measurement and traceability
How can thermal-container SOP version control be maintained?
15 July 2026
How can thermal-container SOP version control be maintained?

Manage the effective date, training and withdrawal of old copies in one change process.

Measurement and traceability
Which records verify thermal-container cleaning?
14 July 2026
Which records verify thermal-container cleaning?

Link container ID, wash programme and visual inspection in one record; track release and rewash separately.

Measurement and traceability
Set post-maintenance acceptance by affected function
14 July 2026
Set post-maintenance acceptance by affected function

Record repair type, replaced part and affected function; complete the relevant check and link acceptance to the container ID.

Measurement and traceability
Building a skills matrix for container work
13 July 2026
Building a skills matrix for container work

A sample shift matrix shows who can do each task independently, who is learning with support and where coverage is thin.

Warehouse and dispatch
What checks return a repaired thermal container to dispatch?
13 July 2026
What checks return a repaired thermal container to dispatch?

Verify the repair against the model's instructed test; link container ID, load profile and first-dispatch result to the maintenance record.

Measurement and traceability
Thermal container requalification
13 July 2026
Thermal container requalification

Damage, repairs, route or product changes and recurring deviations can warrant review of the thermal plan.

Measurement and traceability