Aris Makina & Otomotiv
← Blog

Measurement and traceability25 / 39

Verifying a thermometer with an ice-water bath
24 December 2024
Verifying a thermometer with an ice-water bath

The cheapest way to build a 0 °C reference in the field is a properly made ice-water bath. It shows within minutes whether a thermometer has drifted, but it is a one-point intermediate check.

Measurement and traceability
How to verify thermometer selection against EN 13485
21 December 2024
How to verify thermometer selection against EN 13485

Cross-check measurement purpose and product needs against the full standard and model datasheet.

Measurement and traceability
EN 13486: periodic verification of a recorder
20 December 2024
EN 13486: periodic verification of a recorder

A new device, a changed probe, a fault or a repair all call for verification; the regular interval is set by the recorder owner and its client. The check compares the device with a working-standard thermometer.

Measurement and traceability
What EN 12830 asks of a recorder
19 December 2024
What EN 12830 asks of a recorder

EN 12830 defines the tests, performance and suitability of temperature recorders. When choosing a device, ask for the conformity declaration for the exact model and the edition it was assessed against.

Measurement and traceability
What records does cross-docking software need?
8 December 2024
What records does cross-docking software need?

Test handling-unit IDs, order-destination matching, movement timestamps and exception records in the real flow.

Measurement and traceability
Labels and barcodes in cross-docking
2 December 2024
Labels and barcodes in cross-docking

Barcode height, edge clearance, print settings and the record kept for an unreadable code: the four things a cross-dock label has to define.

Measurement and traceability
How to use logger data in shelf-life decisions
24 November 2024
How to use logger data in shelf-life decisions

Link the time series to a calibrated device and product model; a chart alone does not set days remaining or release status.

Measurement and traceability
How can a sensory panel contribute to shelf-life studies?
14 November 2024
How can a sensory panel contribute to shelf-life studies?

Sensory results assess product attributes, not microbiological safety. Use the panel within the appropriate part of the product study.

Food quality and shelf life
The microbial growth curve and the lag phase
11 November 2024
The microbial growth curve and the lag phase

The growth curve shows the count of living cells changing through four phases. Temperature raises the growth rate and shortens the lag time, and lag is not the same in every product.

Food quality and shelf life
How to plan samples for a shelf-life study
10 November 2024
How to plan samples for a shelf-life study

Plan lots, packaging, time points and analysis methods with the laboratory in advance.

Food quality and shelf life
Shelf life with the Arrhenius equation
7 November 2024
Shelf life with the Arrhenius equation

The Arrhenius equation gives the rise of spoilage rate with temperature through one parameter (Ea), so shelf life measured at two temperatures predicts a third. Its valid range matters as much as the formula.

Food quality and shelf life
How shelf life is calculated
6 November 2024
How shelf life is calculated

Shelf life does not come from a ready-made formula, but when temperature changes the new period can be estimated. With the Q10 method, a product lasting 10 days at 4 °C lasts about 7.6 days at 8 °C.

Food quality and shelf life
How to measure the workload of temperature records
5 November 2024
How to measure the workload of temperature records

Measure logging time, missing fields and retrieval effort in a sample route to simplify the form.

Measurement and traceability
Who records field temperature measurements?
4 November 2024
Who records field temperature measurements?

Assign measurement time, method, record location and backup owner in the route procedure.

Measurement and traceability
Who owns a process error?
2 November 2024
Who owns a process error?

Separate the roles for reporting, product assessment and corrective-action approval in the SOP.

Risk and emergencies
How many items should a checklist have?
1 November 2024
How many items should a checklist have?

Test whether critical steps are clear and verifiable in the field, not the item count.

Measurement and traceability