Aris Makina & Otomotiv
← Blog

Warehouse and dispatch21 / 36

The filleting line in a fish plant
4 May 2025
The filleting line in a fish plant

Receiving, filleting, packing and cold store never run at the same speed, and the difference sets how long product waits on the bench. Lot and time records show where.

Warehouse and dispatch
Build a handoff record from slaughterhouse to cutting plant
3 May 2025
Build a handoff record from slaughterhouse to cutting plant

Link lot identity, dispatch time, vehicle and receiver acceptance in one file. Assess product condition and measurements under site procedure.

Containers and equipment
Match frozen vegetable dispatch to line output
2 May 2025
Match frozen vegetable dispatch to line output

Link line exit, buffer entry and vehicle loading times to the lot. Check holding location and measurements against product instructions.

Warehouse and dispatch
Ripeness and cold at the kiwi harvest
23 April 2025
Ripeness and cold at the kiwi harvest

Kiwifruit is picked firm and kept for months. What makes that possible is measured harvest maturity and cooling working together.

Food quality and shelf life
The first hours of the apricot and peach harvest
20 April 2025
The first hours of the apricot and peach harvest

Stone fruit keeps ripening after picking. The harvest-day clock and the first cooling decide where, and how fast, that ripening happens.

Food quality and shelf life
Record the interval from citrus harvest to packing
18 April 2025
Record the interval from citrus harvest to packing

Link field shade, harvest time and packhouse receipt to the lot; take cooling targets from variety-specific instructions.

Food quality and shelf life
Receiving imported salmon and seafood
13 April 2025
Receiving imported salmon and seafood

At the terminal, product temperature, documents and seals are checked together. Fresh and frozen fish fall under different figures in the regulation. The figures, how to write the acceptance threshold and where to take the reading follow.

Warehouse and dispatch
Anchovy season, from boat to market hall
11 April 2025
Anchovy season, from boat to market hall

Anchovy belongs to a fish family that can form histamine. From boat to market hall the regulation asks for fast chilling, fast unloading and refrigerated transport; in peak season the queue is what breaks that chain.

Warehouse and dispatch
How to learn a factory's receiving process before delivery
7 April 2025
How to learn a factory's receiving process before delivery

Confirm security, internal route, appointment, parking, and receiving steps with the site contact in advance.

Warehouse and dispatch
How to manage a reefer container appointment at an Aegean port
1 April 2025
How to manage a reefer container appointment at an Aegean port

Confirm current terminal slot and gate instructions; record container, documents and power handoff.

Warehouse and dispatch
Measuring cold-chain deliveries between Istanbul's two sides
27 March 2025
Measuring cold-chain deliveries between Istanbul's two sides

Do not choose a bridge or ferry crossing by assumption; compare actual trip, wait and product records across options.

Transport and routing
Manage the warehouse plate cycle with records
22 March 2025
Manage the warehouse plate cycle with records

Record issue, return, damage and freezing status against plate IDs. Shift owners can resolve gaps and prepare the next trip from actual stock.

Warehouse and dispatch
Make post-wash drying a verifiable step
18 March 2025
Make post-wash drying a verifiable step

Add drying area, container ID and inspection to the wash record. Keep wet containers separate from clean, dispatch-ready stock.

Containers and equipment
How to manage plate preparation during a power outage
13 March 2025
How to manage plate preparation during a power outage

Record interrupted cycles and affected lots; verify manufacturer and quality acceptance before reusing plates.

Risk and emergencies
Manual records and controlled continuity during a WMS outage
8 March 2025
Manual records and controlled continuity during a WMS outage

Maintain batch and movement traceability manually during an outage. Decide to continue or stop based on record capability and authorised procedure.

Risk and emergencies
Prepare a traceable per-trip temperature summary
3 March 2025
Prepare a traceable per-trip temperature summary

Match trip ID, measurement point, device and timestamps. Route deviations and data gaps to the authorised owner under product instructions.

Measurement and traceability