Aris Makina & Otomotiv
← Blog

Cost and investment17 / 27

Scale equipment capacity in evidence-based stages
18 January 2024
Scale equipment capacity in evidence-based stages

Tie each growth step to peak-period data and current customer requirements. Define pilot measurements, costs and the next decision point in advance.

Cost and investment
How to calculate transport cost in a set-menu price
12 January 2024
How to calculate transport cost in a set-menu price

Collect a week's route, container, washing and return records, then divide transport costs by portions accepted at delivery.

Cost and investment
Which cost lines matter in a refrigerated conversion?
9 January 2024
Which cost lines matter in a refrigerated conversion?

Assess more than body and unit price: weigh payload, axle limits, usable dimensions, wiring, testing, downtime and the fallback plan together.

Cost and investment
How to show cold delivery in a quote
7 January 2024
How to show cold delivery in a quote

State cold-service scope and cost assumptions in the quote. Use customer requirements, route records and current expense documents in the calculation.

Cost and investment
Planning an equipment maintenance budget from records
27 December 2023
Planning an equipment maintenance budget from records

Collect service invoices, parts, labor and downtime by asset, then update the plan with current quotes.

Cost and investment
How should a small business choose its first equipment?
26 December 2023
How should a small business choose its first equipment?

Define first equipment needs using delivery records, a field trial and comparable quotations.

Cost and investment
Which records show a seed lot's viability?
20 December 2023
Which records show a seed lot's viability?

A certificate is a starting point. For carry-over stock, review lot history and a current germination test against product instructions.

Warehouse and dispatch
Vehicle or containers: how to compare the capital decision
16 December 2023
Vehicle or containers: how to compare the capital decision

Use utilisation, ready containers, route delays, and dated quotes to find which investment addresses the bottleneck.

Cost and investment
Equipment as an asset on the balance sheet
15 December 2023
Equipment as an asset on the balance sheet

Single-use packaging is expensed in the period it is used. A returnable container that works for years is recorded as an asset and its cost is spread through depreciation; in Türkiye, items up to 12,000 TL in 2026 may be expensed directly.

Cost and investment
Which records show the financial effect of product waste?
7 December 2023
Which records show the financial effect of product waste?

Match waste, returns, reshipment, and lost-sale records by period and product; avoid counting the same event twice.

Cost and investment
How to measure fuel per delivery
6 December 2023
How to measure fuel per delivery

Link route, stops, load and refrigeration runtime, then compare active and passive options at similar workloads.

Cost and investment
What to check on a second-hand refrigerated body
29 November 2023
What to check on a second-hand refrigerated body

Check moisture, sealing, repairs and unit history with records and measurements; appearance alone is not enough.

Vehicle bodywork hardware
Include passive cooling in emissions accounting with data
18 November 2023
Include passive cooling in emissions accounting with data

Define the boundary, service life and allocation method; document electricity, fuel, equipment and waste data by source.

Sustainability and carbon
Which times and costs should you measure for a second delivery round?
16 November 2023
Which times and costs should you measure for a second delivery round?

Compare return, unloading, preparation, and reload times with the second round's added costs and orders.

Transport and routing
Plan tourist-season supply from actual orders
15 November 2023
Plan tourist-season supply from actual orders

Size peak capacity from order and route records, not population assumptions; account for off-season use too.

Transport and routing
How to calculate the real cost of a small order on a route
8 November 2023
How to calculate the real cost of a small order on a route

Before accepting, measure added stop time, variable delivery cost, and fit with the existing route.

Cost and investment