Aris Makina & Otomotiv
← Blog

Risk and emergencies11 / 29

Thermal shipment exception approval
29 June 2026
Thermal shipment exception approval

Show scope, evidence, affected products and containers, approver and follow-up in the exception record.

Measurement and traceability
Total time outside temperature limit
29 June 2026
Total time outside temperature limit

Two short events and one long event can produce the same total duration.

Risk and emergencies
Find unstarted recorders by matching run lists
28 June 2026
Find unstarted recorders by matching run lists

Match planned runs to downloaded files by ID; investigate unmatched runs without assuming the recorder was never started.

Measurement and traceability
How to reconcile the thermal-container pool with physical stock
28 June 2026
How to reconcile the thermal-container pool with physical stock

At one cut-off time, match identity, status and location, then classify each difference by container.

Measurement and traceability
Temperature rate-of-change alarm
28 June 2026
Temperature rate-of-change alarm

A fixed limit sounds only after it is crossed. The hard part of a rate alarm is telling a door opening from a real failure; here is how to set the hold time, the sensor position and the WHO requirements.

Risk and emergencies
Cold-chain KPI denominator definition
28 June 2026
Cold-chain KPI denominator definition

Explain the assessed total and missing records before interpreting a trip deviation rate.

Measurement and traceability
Adding event notes to temperature graph
27 June 2026
Adding event notes to temperature graph

Make graph review repeatable with event codes, start and end times, and an owner aligned to logger time.

Risk and emergencies
Evidence file for thermal damage claim
27 June 2026
Evidence file for thermal damage claim

Assess a damage claim using pre-event handover, raw measurements and authorised product disposition alongside the outcome.

Measurement and traceability
Cold-chain control chart
27 June 2026
Cold-chain control chart

Track comparable trips with one defined measure; keep process signals distinct from product acceptance limits.

Risk and emergencies
What does a thermal-container handover signature confirm?
27 June 2026
What does a thermal-container handover signature confirm?

Separate signature scope from identity, quantity, visible condition, receipt time and data still under review.

Measurement and traceability
Separating a one-off from a repeating pattern
26 June 2026
Separating a one-off from a repeating pattern

Track repeat counts with eligible run denominators, then check shared conditions, record coverage and the next period.

Measurement and traceability
How should a thermal-container temperature heat map be prepared?
26 June 2026
How should a thermal-container temperature heat map be prepared?

How to set the sensor count and positions, the time window and a fixed colour scale for a thermal-container heat map.

Risk and emergencies
How should role-based access to logger data be organised?
26 June 2026
How should role-based access to logger data be organised?

Separate viewing, export, event entry and device-setting permissions by job role.

Measurement and traceability
Causation and correlation in temperature data
26 June 2026
Causation and correlation in temperature data

If deviations appear on every busy route, workload is a strong clue but not a cause on its own.

Risk and emergencies
What evidence should you organise for a damage claim?
25 June 2026
What evidence should you organise for a damage claim?

No claim outcome is guaranteed; link photos, delivery notes, logger data, serials, and policy terms to the incident.

Risk and emergencies
Can a container ship without its safety bar?
25 June 2026
Can a container ship without its safety bar?

Hold dispatch while a bar is missing; verify the model and part, then get an authorized disposition.

Containers and equipment